Transfer Station Discharge Chute
Iron Ore up to 200 mm, 7,000 TPH
Excessive wear, build-up, belt tracking, impact idler failure on receiving conveyor.
New wear liner package was designed (using DEM) to meet the specific requirements of the application. Premature wear of the chute and failed rollers eliminated, bogging chutes and belt drifting significantly reduced.